5472 GI/2019 (1)
jftLVªh laö Mhö ,yö&33004@99 REGD. NO. D. L.-33004/99
vlk/kj.k
EXTRAORDINARY
Hkkx II—[k.M 3—mi&[k.M (ii)
PART II—Section 3—Sub-section (ii)
izkf/dkj ls izdkf'kr
PUBLISHED BY AUTHORITY
la-
3438] ubZ fnYyh] eaxyokj] vDrwcj 22] 2019@vkf'ou 30] 1941
No. 3438] NEW DELHI, TUESDAY, OCTOBER 22, 2019 /ASVINA 30, 1941
बर ,20, बर109रक,ा.आ(,ई)ेआतक बर ,20, बर109रक,ा.आ(,ई)ेआतक बर ,20, बर109रक,ा.आ(,ई)ेआतक बर ,20, बर109रक,ा.आ(,ई)ेआतक
अिधसूचनाअिधसूचनाअिधसूचनाअिधसूचना
बर,2019कराार.आर(ईबर, 2019
का.आ. का.आ. का.आ. का.आ. 3790379037903790(अ)(अ)(अ)(अ)....———— )(ेरतह ‘दरश7त’7र हर. -शईि9रसंरश86स81(रढ़र3यग’2थर।ह(-र,2 ’[तरफ/र8श(647कराफए]रतह र
का.आ. 2920 (ई) के तहत ‘शड7रॉत’ीनज0म9)करॉ0’81)’1कर3गत70र27र3मतरश’स49र5.8 न’)6 ग[79त70रत8र9न:)त(’;र
आदेश, 2017’ 7’79र,त)’र<’र87शतह रॉ=’न9र।ज हरत8र(’79>र/र8श(647कराफए?र()रत8र@बAर27र)(ेर=’7(9)रस’ तर
B)ई7जर5499बCश;रश8।(र8न8=Dर8।(E’7तथरतह रश’<र8नि’7-8नसी6रतह र3ग7’‘(र3Fर92हीरतह रॉ=’न9र।ज हरत8र(’79>रग।1हर
.<’6(Gरएढ़र.ॉH1कराफए?रत7 29र@बर87शहरत’I9Iरश[Iरएढ़फा5ब;रतह र(।(र,2 ’[तरएढ़र.ॉH1कराफए?रतजर.8Eशई8ि(र=’7(रतह र
7’7गJरसंरॉत’8ी(र27रKफर7ई कराफए?र(तरॉ=’न9र92हीरतह रश’<र. -4Lर. -शईि9रसंरMसरश[Iरए-Kरतह र3यग’2थरतह र81Cर
8न8 स’6(’रN’7’रOन(ेरॉस’0 र2ह हरत8री(6रग7र,2 ’[तरKफरसबकराफए?रतजर=’7(रतह र7’7गJरसंरश[ीज8E(रत’I9Iराए?K5ब;रतह र
(।(रॉत’8ी(र,त)’र@)’र<’A
2. 27र)(ेर3Pज@थर हर92हीरतह र. -ग’1 रतह र81Cर27र.8Eतरशस)रस’[@’र27र74,तरQशशहरश[4[8E(रस-Rथरग7रश[4[8E(र
8।(E’7तथरतह रश’<रिि’6रत8र@बकरOन-ॉस’0 रतजरएKIफ]Iाफए?रतजर=’7(रतह र7’7गJरसं ॉत’8ी(रत’I9IरKSSTर5ब;रतह र
स’U)सरशहरफSर8श(647कराफए?र(तर4V’र,2)’र@)’कर87शहर4’2रसंरएार8श(647कराफए?रतजर=’7(रतह र7’7गJरसंरॉत’8ी(र
त’I9Iरश[IरS]?]5ब;रतह र(।(र92हीरसंरशईि94Lरश=9र3यग’2थरतहर81Cराफर8श(647कराफए?र(तर4V’र,2)’र@)’कर27र4’2रसंर
. -शईि9रसं ॉय)हतर3यग’2थरतह रशसWर38018>(रत’)’6‘न) रत8र8(8<)थरतह रश’<रश=9र3यग’2थरतह र81Cर,2 ’[तरएाIएफIाफए?र
तह रत’I9Iर/ा/T5ब;रतह र(।(रफएर7 न79कराफएTरत7र,2)’र@)’AरCशग9न9रसXYई1रतह रस’स1हरसंकरOनरॉस’0 रत8र8(8<रतजर
,2 ’[तरएKIफाIाफएTरतजर=’7(रतह र7’7गJरसंरॉत’िशत का.आ. सं. 861(ई) के तहत 01.01.2019 से बढ़ाकर 31.03.2019
,त)’र@)’र<’कर7जरQशरी(6रग7र<’र,तरZशहर8 स’6(’[\8नत’शत]’6[र हर.ग हरCशग9न9रसXYई1र,2 ’[तरKएIएफIाफए?रशहरगईन6र
ग79W0रॉ)ज@ी’1’[रतजरॉO(-(रत7र,2Cर।थAरQशतह र.1’न’र74,तरQ‘नम67थरतह र81Cरश9^77र,2ी’8 2_ीर(H)’7र,तCर7’र7।हर
<हकरQ‘नम67थर5स2रS-/;रतह र81CरOन-ॉस’0 रशहर`ईमर=’7(रतह र7’7गJरसंर,2 ’[तरफSIफएIाफएTरतजरॉत’8ी(रत’I9IरSढ़5ब;रतह र
2 THE GAZETTE OF INDIA : EXTRAORDINARY [P ART II—SEC. 3(ii)]
(।(र9@हर`।रस’।रतह र81Cर.<’6(GरKफर7ई कराफएTर(तर4V’बर@बकर87शहर,2 ’[तरफKर7-1’बकराफएTरतजर=’7(रतह र7’7गJरसंर
ॉत’िशत का.आ. सं. 2320(ई) के तहत 30.09.2019 तक बढ़ाया गया था।
3. 27र)(ेरWस(’करग79W0रशहरश[4[8E(रस’स1थर27रग79W0रॉ)ज@ी’1’[रत8र(H)’79रतह रO(7रग7र8नि’7रत7(हरaCर3Pज@र
हर. -ग’1 रतह र81Cर27रशस)रत8रस’[@रत8करQ‘नम67थर5स2रS-/;रतह र81CरOन-ॉस’0 रKफIफTIाफए9 से 31.12.2019 तक
4V’)’र@)’रस’ ’र7’C@’र4ी(_र,तरZशहर8 स’6(’[रतह रग’शरQशर92हीरसंर8न8 b26cर9बCशरतह र. -dगरनHEर9बबश9र।जर27र
.‘(7’6e9)रग79W0रॉ)ज@ी’1’[रशहरग79W0र^7गजम6र।जर(’,तर92हीरत’रश-ि’fर,M)’‘न) र।जरशतह Aरर
[फा. सं. 223/140/2017-आर एंgरg9र5@-0न]’र8 )[J0;]
डॉ. बी.एस. नेगी, श1’।त’7\नHh’8 तर‘जी’, एमएनआरई
MINISTRY OF NEW AND RENEWABLE ENERGY
NOTIFICATION
New Delhi, the 22nd October, 2019
S. O. 3790(E).—Whereas the Central Government had issued “Solar Photovoltaics, Systems, Devices and
Components Goods (Requirements for Compulsory Registration) Order, 2017 “vide S.O 2920 (E) dated 5 September
2017 for six products included in the Schedule with the date of coming into force with effect from 5th September
2018. And whereas, after having discussions with the various stakeholders including the Bureau of Indian
Standards (BIS), the date of coming into force of the said Order was advanced to 16th April 2018 on the condition of
self-certification by manufacturers for products at Sl. No. 1-3 in the schedule annexed to the order applicable till
30th June, 2018 published in Gazette of India notified on 16th April, 2018 vide S.O. 1602 (E ), which was revised
vide S.O. 2183 (E) published in Gazette of India on 30.05.2018.
2. And whereas, the industry had sought more time for compliance to the order and whereas the issues involved
were discussed with related stakeholders, the self-certification was extended to 4th September, 2018 vide S.O. 3449
(E) published in Gazette of India on 13.07.2018, which was further extended to 20th September 2018 for all products
listed in the order vide S.O No. 4787(E) published in Gazette of India on 12th September 2018, and further to
1st January 2019 vide S.O. 5259 (E) dated 12.10.2018 for all items with dates of implementation indicated against
each product in the schedule. In the case of SPV Module, the date of self-certification was extended from 1.01.2019 to
31.03.2019 vide S.O. No. 861 (E) published in Gazette of India on 13.02.2019 subject to the condition that such
manufacturers /developers had submitted their SPV Modules to test laboratories before 31.10.2018. Further, whereas
the series guidelines for inverters were in the process of preparation, the self- certification relaxation for inverters
(items 4-5) was further extended by six months i.e. up to 30th June 2019 vide S. O 46(E) published in Gazette of India
on 4.01.2019, which was further extended up to 30.09.2019 vide S O 2320(E) published in Gazette of India on 3rd
July 2019.
3. And whereas, considering the capacity, issues relating to testing and the level of preparation of test labs the
industry sought more time for compliance, the self - certification for inverters (items 4-5) stands extended from
30.9.2019 to 31.12.2019 subject to the condition that such manufacturers have valid IEC corresponding to IS specified
in the said order, and test reports from international test labs, for smooth implementation of the order.
[F. No. 223/140/2017-R&D(Quality Control)]
Dr. B.S. NEGI, Adviser/Scientist G, MNRE